Tuesday, May 17, 2011

Things are changing on Bayshore

Out jogging last night and caught these huge monsters laying in wait around Rome and Bayshore.  It made me wonder if the city is adding another traffic signal, perhaps at Rome and Bayshore, although the work descriptions only note upgrades to existing traffic signals.

The City of Tampa's website describes the work as this:
Phase I of the project will provide for continuous 4 foot bicycle lanes in both directions along Bayshore Boulevard between Platt Street to Rome Avenue.  The existing 4-lane roadway, between Platt Street and the Davis Island Bridge, will be modified to provide 4 foot continuous bicycle lanes and a concrete median.  The existing 6-lane roadway, between the Davis Island Bridge and Rome Avenue will be modified to a 4-lane roadway with a 14 foot grassed median and 4 foot bike lanes.  The project will also include upgrading the existing traffic signals and enhanced pedestrian features at the intersections of Bay-to-Bay Boulevard and Platt Street.  These enhancements will provide for improved safety for pedestrians and bicyclists that utilize Bayshore Boulevard. 
St. Pete Times article

No comments:

Post a Comment